Cherokee-M Construction - Fin can
April 30, 2003:
All the component parts have been built, finally starting to assemble the fin can today. A couple of miscelaneous steps to start, epoxying the u-bolt in the aft coupler bulkhead, and epoxying the aft centering ring (thrust bulkhead) to the motor tube. Aeropoxy (R2032 Resin and PH3660 hardener) thickened with West Systems 404 high-density filler.
Epoxying the u-bolt to the aft coupler bulkhead:

Epoxying the aft centering ring (thrust bulkhead) to the motor tube:

Around this time my car's odometer hit this interesting number:
